Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 32 results ...

Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: an investigation. Construction Management and Economics, 24(01), 81-96.

Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(01), 45-54.

Andi (2006) The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(01), 69-80.

Arif, M, Al Zubi, M, Gupta, A D, Egbu, C, Walton, R O and Islam, R (2017) Knowledge sharing maturity model for Jordanian construction sector. Engineering, Construction and Architectural Management, 24(01), 170-88.

Asiedu, R O, Frempong, N K and Alfen, H W (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(01), 21-39.

Assaf, S A and Barhamain, S Y (1996) Factors affecting construction practices in Makkah Al-Mukkaramah, Saudi Arabia. Building Research & Information, 24(01), 27–30.

Assaf, S A, Al-Musallami, A I and Shash, A A (1996) Professional architectural/engineering consultancy practices in Saudi Arabia. Building Research & Information, 24(01), 59–62.

Bubshait, A A, Tahir, B M and Jannadi, M O (1996) Use of microsilica in concrete construction. Building Research & Information, 24(01), 41–9.

Chang-Richards, Y, Wilkinson, S, Seville, E and Brunsdon, D (2017) Effects of a major disaster on skills shortages in the construction industry: Lessons learned from New Zealand. Engineering, Construction and Architectural Management, 24(01), 2-20.

Dann, N, Hills, S and Worthing, D (2006) Assessing how organizations approach the maintenance management of listed buildings. Construction Management and Economics, 24(01), 97-104.

Davies, K, McMeel, D J and Wilkinson, S (2017) Making friends with Frankenstein: Hybrid practice in BIM. Engineering, Construction and Architectural Management, 24(01), 78-93.

Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(01), 19-30.

De Silva, G, Perera, B and Rodrigo, M (2019) Adaptive reuse of buildings: the case of Sri Lanka. Journal of Financial Management of Property and Construction, 24(01), 79–96.

Enshassi, A (1996) Materials control and waste on building sites. Building Research & Information, 24(01), 31–4.

Friedman, A and Cammalleri, V (1996) The impact of R-2000 building technology on Canadian housing. Building Research & Information, 24(01), 5–13.

Huang, Y C (2006) Graphical-based multistage scheduling method for RC buildings. Construction Management and Economics, 24(01), 5-18.

K.V., P, V., V, R., V and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(01), 58–78.

Kärnä, S and Junnonen, J-M (2017) Designers’ performance evaluation in construction projects. Engineering, Construction and Architectural Management, 24(01), 154-69.

Kalutara, P, Zhang, G, Setunge, S and Wakefield, R (2017) Factors that influence Australian community buildings’ sustainable management. Engineering, Construction and Architectural Management, 24(01), 94-117.

Leung, M-Y, Liu, A M M and Wong, M M-k (2006) Impact of stress-coping behaviour on estimation performance. Construction Management and Economics, 24(01), 55-67.

Lu, W, Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(01), 118-32.

Lu, W, Li, Z and Wang, S (2017) The role of justice for cooperation and contract’s moderating effect in construction dispute negotiation. Engineering, Construction and Architectural Management, 24(01), 133-53.

Mbachu, J and Nkado, R (2006) Conceptual framework for assessment of client needs and satisfaction in the building development process. Construction Management and Economics, 24(01), 31-44.

Osei-Kyei, R, Chan, A P, Yao, Y and Mazher, K M (2019) Conflict prevention measures for public–private partnerships in developing countries. Journal of Financial Management of Property and Construction, 24(01), 39–57.

Santoso, D S and Bourpanus, N (2019) Moving to e-bidding. Journal of Financial Management of Property and Construction, 24(01), 2–18.

Sarkar, A, Godbole, P N and Chakrabarti, S C (1996) Potential for expert systems in the assessment and repair of fire damaged buildings in India. Building Research & Information, 24(01), 51–8.

Semaan, N and Salem, M (2017) A deterministic contractor selection decision-support system for competitive bidding. Engineering, Construction and Architectural Management, 24(01), 61-77.

Shahtaheri, M, Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(01), 40-60.

Singla, H K and Samanta, P K (2019) Determinants of dividend payout of construction companies: a panel data analysis. Journal of Financial Management of Property and Construction, 24(01), 19–38.

Thomas, H R, Rees, S W and Lloyd, R M (1996) Measured heat losses through a real ground floor slab. Building Research & Information, 24(01), 15–26.

Velho Júnior, V E, Costa Melo, I, Alves Junior, P N and Rebelatto, D A d N (2019) Analysis of real estate management of lease service agreements by the public sector of a Latin American metropolis. Journal of Financial Management of Property and Construction , 24(01), 97–122.

Wild, S (1996) Observations on the use of ground waste clay brick as a cement replacement material. Building Research & Information, 24(01), 35–40.